Visy Paper: Cooling Tower Compliance and Efficiency Upgrade

FlowMatrix completed a vital cooling tower upgrade at Visy Paper, replacing ageing drift eliminators to enhance system efficiency and ensure compliance with environmental standards.

Project Details:

Client

Visy Paper Pty Ltd

Project Status

Complete

Job Type

Drift Eliminator Replacement

Year Completed

2024

Project Overview

FlowMatrix completed an important upgrade at Visy Paper, demonstrating our expertise in maintaining and improving industrial cooling systems. The project involved the removal and replacement of drift eliminators, ensuring optimal performance and compliance with safety standards.

The goal was to replace ageing, corroded drift eliminators with new, high-quality components to enhance system efficiency and reduce environmental emissions. Our team meticulously planned and executed each phase of the project to ensure minimal disruption to plant operations.

The Workflow: From Arrival to Completion

Removal and Disposal

We began by removing the old drift eliminators and properly disposing of them in site bins, ensuring environmental and safety compliance.

Supporting Structures

The corroded drift eliminator supports were carefully removed and replaced with new supports supplied by FlowMatrix, designed for durability and stability.

Installation of New Components

New Brentwood CFUltra drift eliminators were installed, providing advanced emission control and efficiency. We secured the new eliminators with straps and buckles to ensure proper fit and safety.

System Testing

Once installed, the system was de-isolated, and our team conducted thorough checks to confirm correct operation and performance.



Project Success

Documentation and Reporting

All permits and Job Safety Analyses (JSA) were closed, with a comprehensive report generated to document the work completed.

Safety and Quality Assurance

FlowMatrix prioritises safety and quality at every stage. Our team adheres to strict safety protocols and uses only high-quality materials to ensure long-lasting results.

The successful drift eliminator replacement at Visy Paper highlights FlowMatrix’s capability to execute precision upgrades in complex industrial environments.

We thank Visy Paper for their continued trust and look forward to supporting future projects with the same commitment to excellence.

Connect with us today to explore how our expertise can deliver a precise solution for your requirements.



Gallery

Loading…

Request a Quote

Get in touch – we’re here to answer your questions and provide the support you need.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.